Finally got to replacing the POS manual winch for the Optibeam OB12-4 tower with a 110 V 2000 lbs hoist. What a relief. The tower went up to 75 feet in about 60 seconds. No effort at all. So why is the hoist offset on the platform? Because the cable needs to be in close to the center of the tower.
Categories
-
Recent Posts
- 3Y0K Bouvet Island ongoing planning 2026 January 11, 2025
- N5J Jarvis Island DXpedition July 31, 2024